Home › New Product Development Guides

Cost And Schedule Are Set Long Before A Product Launches

New Product Development Guides From The Engineers At PPS

Free guides on DFMA, engineering simulation and a Stage-Gate process

Pick a guide and we email the PDF to you, free. No sales call needed.

Start With The Decision Your Program Is Facing Right Now

Find The New Product Development Guide For Your Decision

Three Common Problems, The Guide For Each, And Who Can Help

Quotes Are Too High

The design is close to release and supplier quotes are high. Cut parts and cost before the tooling is bought.

Start With DFMA Guide

Rather have us do it? Design for manufacturing services

Unsure It Will Survive?

You're not sure the design will survive its loads, or whether you need another prototype before you build.

Start With Simulation

Rather have us do it? FEA services · CFD consulting services

Your Program Is Slipping

Product launch delayed by engineering? Set what each gate must prove, then decide with data, not momentum.

Start With Stage-Gate

Rather have us do it? Product development services

Want help with your own design? Send us the data. We reply within one business day, and the first step is a free assessment of your project scope.

Free Guides

New Product Development Guides You Can Use Today

Three Free Guides On The Methods We Use On Client Programs

New product development is where a product’s cost, schedule and reliability are decided. That happens long before the first part ships. These guides explain the methods our engineers use to get those decisions right. Each one takes a single method and shows how it works on real hardware. It also points out the mistakes that make programs late or expensive.

The Product Design and Development Guide sets out a data-driven Stage-Gate process. It shows what each gate should prove before the program moves on. The Engineering Simulation Guide explains how FEA, CFD and multiphysics let you test a design before you build it. It also shows how to set allowables your team can defend. The DFMA Implementation Guide shows how to cut part count, simplify geometry and use standard processes. That way the design costs less to build and assemble.

Each guide starts with a short tool you can use today: a worksheet or a checklist. All three are free PDFs. Enter your work email and we send the guide right away. We write for engineers and the managers who run their programs. The guides assume you know the basics and focus on the decisions that change the outcome. Use them to plan a new program, tighten one that is running, or brief your team.

Our engineering insights go deeper on each topic, one problem at a time. If you only have time for one guide, the cards above show where to start. A guide can’t see your loads, your drawings or your schedule, though. When a decision depends on the answer, send us the data. The first step is a free assessment that ends with a roadmap: what we would check, change or test next, and why.

Covers of three free new product development guides from PPS, each with a 2-page worksheet or checklist for engineering teams

Product Development

Use the Stage-Gate Checklist to set what each gate must prove, then run a data-driven process to launch.

Checklist + 11-page guide

Covers

Stage-Gate

Gates

Launch

Get The Process Guide

Engineering Simulation

Run the 12-point model checklist, then use FEA, CFD and multiphysics to test a design before you build it.

Checklist + 26-page guide

Covers

FEA

CFD

Multiphysics

Get Simulation Guide

DFMA Design Playbook

Score one assembly with the Part-Count Worksheet, then cut parts, simplify geometry and lower unit cost.

Worksheet + 22-page guide

Covers

DFMA

Part Count

Unit Cost

Get The DFMA Guide
Proof

New Product Development Proof From The Public Record

Published Results For Each Method, Plus One Outcome From Our Work

Public benchmark · IEEE Spectrum, 1995

Built In Software First

65%

Fewer Change Errors

+15%

Better Than Target

On the first airliner designed entirely on computer, digital pre-assembly eliminated 65% of change errors and rework, beating its target by 15% (IEEE Spectrum, 1995).

Trade-press report. Digital design and virtual pre-assembly, not FEA; FEA and CFD apply the same principle to stress, heat and flow. Source: IEEE Spectrum, 1995. Not a PPS result.

Public benchmark · NASA, 2004

Late Changes Cost More

3–8x

In Design

21–78x

In Integration And Test

A NASA study found that a requirements error fixed during design costs 3 to 8 times as much as one fixed during requirements, and 21 to 78 times in integration and test (NASA, 2004).

Agency study of NASA and industry systems data. Baseline: the cost of fixing the same error during requirements. Source: NASA JSC, 2004. Not a PPS result.

Pressure Vessel · Industrial Client

Thinner Walls, Same Code Margin

15%

Thinner Wall

0

Code Margin Lost

Elastic-plastic analysis to ASME BPVC Section VIII, Division 2

See Nonlinear Analysis FEA

Pure Prime Solutions (PPS) uses a Stage-Gate-based product-development process and can combine DFMA, FEA, and CFD within a turnkey engineering engagement managed through a single point of contact. The public record shows what the method can do. What it does for you depends on your constraint, and the assessment tells you.

Stage-Gate: Five Stages, Each Ending In A Gate You Approve

New Product Development Stages And Gates, Idea To Launch

Product Development Life Cycle With Your Approval At Every Gate

01
Idea
Pencil sketch of a cordless tool turning into a 3D wireframe

Define the problem, the customer and a first check of physics and cost.

Gate 1: idea evaluation

02
Concept
Wireframe tool concept with an early stress check

Set the requirements, name the top risks and test the concept in simulation.

Gate 2: preliminary design review

03
Engineering
Exploded tool assembly with stress colors and a prototype housing

Detailed design with FEA, CFD and DFMA, then prototypes that confirm it.

Gate 3: critical design review

04
Launch
Identical finished tools on a short production line

Pilot production by your suppliers, then full scale, with parts built to the drawing.

Gate 4: launch readiness

05
Lifecycle
Finished tool in service inside a review cycle ring

Track the product in service, then improve it, retire it or pivot.

Gate 5: lifecycle assessment

We guarantee our work, not savings, test results or dates. If we agreed to resolve an issue, we fix it. If we missed something in our design QC, we fix it. If your supplier can’t make the part, or it can’t be bought, within three years of delivery, we fix that too.

Engineering Insights

Get New Product Development Articles By Email

Real Engineering From Our Team, Sent When A New Article Publishes

  • New articles when they publish
  • Written by our engineers
  • Unsubscribe in one click
FAQ

New Product Development Questions Readers Ask

Short Answers On The Guides, The Methods, And Getting Help

Which New Product Development Guide Should I Read First?

Most readers come to our new product development guides with one decision in front of them. The design may be close to release with high quotes. You may doubt it will survive its loads. Or the program itself keeps slipping, and nobody agrees on what the next gate should prove.

Reading the wrong guide first costs time you may not have. Each guide solves a different problem, so the order matters. A program that slips rarely fixes itself. NASA's program life cycle treats each phase boundary as a natural point for a clear go or no-go decision, and so should yours.

If quotes are high, start with the DFMA Implementation Guide. If you doubt a design will hold, read the Engineering Simulation Guide. If the program slips, read the Product Design and Development Guide. The methods connect: simulation and DFMA data feed the gates, and the gates decide when the design is ready to build. Unsure which applies? Describe your program on our contact page. We reply within one business day.

What Happens After I Download A Product Development Guide?

When you request a new product development guide, we email the PDF to the address you enter right away. Check your spam folder if it doesn't arrive within a few minutes. That is all that happens. There is no sales call and no follow-up sequence unless you ask for one.

Many free downloads come with a catch: a call you didn't ask for, weeks of sales emails. US law sets a floor. The FTC says the CAN-SPAM Act requires senders to offer a way to opt out. We add you to our article emails only if you tick that box on the form, and you can unsubscribe in one click.

Our Privacy Policy explains how we use your details. If the guide raises a question about your design, reply to the email or use the contact page. Send the drawings or models you can share. We sign a mutual NDA with you before you share any data. We reply within one business day. The first step is a free assessment that ends with a roadmap.

How Does PPS Run Product Development On Client Programs?

On client programs, we run new product development in five steps: assess, roadmap, engineer, deliver and support. Most programs that slip lack this structure. Work starts before the problem is written down, reviews pass on hope instead of data, and the data a gate needs arrives after the gate.

Each late fix costs much more than the one before. A NASA study of error costs found the price of a fix climbs at every later phase of a program. By the time a problem shows up in test, the tooling may already be bought and the launch date promised to your customers.

After the free assessment and roadmap, our engineers design, analyze and prototype, and you approve each gate. We guarantee our work, not savings, test results or dates. If we agreed to resolve an issue, we fix it. If we missed something in our design QC, we fix it. If your supplier can't make the part, or it can't be bought, within three years of delivery, we fix that too.

Have a design question now? Get a free assessment and roadmap.

Free Assessment. No Obligation. NDAs Available.

Turn New Product Development Into A Product You Ship

Get The Lowest Total-Cost Design, Plus The Data And IP, From One Team

Need new product development consulting for manufacturers? Need new product development consulting for manufacturers? Send your concept, drawings and schedule. We review your project scope in a free assessment and reply within one business day with next steps.

SDVOSB Certified
VOSB Certified
CAGE 8ZK73
NAICS 541330

On-site assessments that require travel are quoted separately.