Gates, schedules, and decisions run by engineers, so the design stays on scope and decisions happen on time.
Decisions made on time.
Covers
Gates
Schedule
Decisions
Turn a new idea into a tested concept with simulation, prototypes, and data you can take to the next gate.
From idea to evidence.
Covers
Concept
Prototype
Test Data
One team runs FEA, CFD, and DFMA as one loop, scoped to outcomes. You own the data and IP by default.
One team and one loop.
Covers
FEA
CFD
DFMA
Single-point design failures ground fleets and trigger costly program reviews.
Find it before flight.
Applications
Flight FEA
Buckling
CFD
Late validation cycles delay vehicle launches across model-year gates.
Ready for the next gate.
Applications
EV Thermal
Crash
NVH
Untested mixing dead zones trigger FDA findings and costly batch rework.
Validate before building.
Applications
Reactor CFD
Mixing
GMP
Promised energy savings disappear when models miss real operating data.
Validate energy savings.
Applications
Turbine CFD
Heat Recovery
Plant FEA
Who writes these articles, and where do the methods come from?
Engineers write every engineering leadership article on this page. The people who run PPS projects write about problems they see on real programs. They cover what went wrong, how they checked it, and what they would do next time. The articles teach methods, not sales pitches.
Advice from people who have never run a program is easy to find and hard to trust. So each post names its author and shows when it was last updated. Nick Duff, Co-Founder & Chairman, CEO, is an aerospace stress engineer on flight-critical aerospace and defense programs. Tom Cushing, Co-Founder & CTO, is a licensed Professional Engineer (PE).
Tom leads the tools, methods, and design QC our engineers use from assessment to delivery. PPS engineers run FEA, CFD, CAD, and DFMA in-house. Every design goes through that QC, and the articles follow the same methods. You can read their full backgrounds on our About page. If something in an article does not match your own project, tell us and we will check. We reply within one business day.
Can I use the methods in these articles on my own programs?
Yes. Each engineering leadership article explains the method step by step, so you can apply it to your own program today. It covers what to set up, what to check, and what a good result looks like. We write for practicing engineers and the managers who lead them.
There is a limit, though. An article cannot see your loads, materials, schedule, or drawings. The same method can mislead you when the inputs are off. When a design decision, a supplier dispute, or a safety margin depends on the answer, get a second look. NASA's guidance on technical reviews also sets clear entry and success criteria for each one.
Use the articles to plan your next project, review a supplier report, or train a new engineer. Bring the hard calls to us. That is what our free assessment is for. You send the data, and an engineer who can see the whole problem reviews your project scope. You get a roadmap that shows what we would check, change, or test next, and why.
How do I improve engineering manager decision making under schedule pressure in reviews?
Good engineering leadership turns a design review into a decision. It is a skill most leadership development skips. Stuck reviews usually miss one of three things: a clear question, agreed evidence, or an owner. Without them, every meeting ends in more homework, and the program waits.
Each extra review burns engineering time and pushes every later gate. NASA's life cycle guidance treats each key decision point as a moment when one decision authority judges readiness. Many commercial programs skip that step entirely, or hold it too late. Then decisions drift, suppliers wait, and changes pile up until a late fix costs far more to make.
Fix it in three moves. First, write down the decision the review must make before anyone presents a slide. Second, agree the evidence in advance: which analysis, test, or cost estimate, and how good each must be. Third, name one owner who decides when the evidence is in. If your program is stuck now, send us the plan and the open questions. We reply within one business day.